prev:Makkah Railway Station, Saudi Arabia
next:King Abudulaziz International Airport, Jeddah, Saudi Arabia
Construction time:2015 Completion time:2017 Project area:45,000㎡ Volume of steel:9,700t
Project description: Steel weight is about 9700t, building area is about 45,000 ㎡. Connection design, shop drawing, fabrication and erection.
Bright spot: BS EN
127--------m.ms6677.com
316--------m.wexin120.com
805--------m.kuaibo66.com
472--------m.hfgcyq.net
318--------m.yzthzx.com